Existing Project

Orapa Power Plant

ABOUT THE PROJECT
Plant has been commissioned with KSE “In-House” experts.

All performance & reliability acceptance tests have been carried out with GE, IEG and KSE.

• Plant on 24 hour availability (peaking / emergency)
• Daily availability declarations and performance
reporting
• 15 minutes start-up & synch to grid
• Dispatch up to 90MW
• Weekly and monthly reconciliations
• On-site laboratory fuel and water quality checks

Cumulative availability from COD – 98.32%