LM6000PD hot commissioning (Nigeria, ABA)

Hot commissioning activities ongoing;

(Start date: January, 2024)

– CWP 020 Pre-Star; and Crank Testing LM6000 / CM-CWP 020
– CWP 030 Rotation Tests and First Fire LM6000 / CM-CWP 030
– CWP 040 Generator I AVR Dynamic Testing and Load Ascension LM6000CM-CWP 040
– CWP 060 Water Injection System Commissioning LM6000_1CM-CWP 060
– CWP 0l0 Water Wash System Commissioning LM6000 / CM-CWP 070
– CWP 080 Sprint I Enhanced Sprint System Commissioning LM6000 / 1CM-CWP 080
– CWP 090 Winterization System Commissioning LM6000 / CM-CWP 090
– CWP 010 Fire and Gas Detection System CO2 Concentration Test LM6000 / 1CM-CWP 010
– CWP 030 Commissioning Close-Out Controls Backup LM6000 / CM-CWP 030