PLANT CAPACITY
80 MW

PLANT TYPE
3X GE LM2500 G4 DLE

FUEL TYPE
Diesel

PLANT MODE
Fast Track – Simple Cycle Base load

LOCATION
Cape Town, South Africa

CATEGORY
Existing Project (COD 2024, October)

CURRENT ROLE
Installation and commissioning

 

SCOPE OF PROJECT MANAGEMENT

Installation and Commissioning of the below covered units

3 x GTG Sets
a) LM2500 G4 DLE gas turbines
b) Generator
c) Gas Turbine package:
i) Turbine and generator enclosures
ii) Ventilation fans
iii) Filter house,
d) Auxiliary systems:
i) Ventilation,
ii) Turbine LO,
iii) Generator LO,
iv) Fuel system,
v) Vibration,
vi) Hydraulic Start,
vii) Fire Systems
viii) Fin fan coolers
ix) Anti-icing systems
x) DLE cooler purge and drain skid,
xi) DLE fuels purge cooling water system skid,
xii) Fuel boost skid
e) MCC’s, TCP’s
f) AVR,
g) Generator Protection system,
h) Synchronization systems,
i) DC System
ii) Exhaust Stack